Choosing the right charging hardware for your depot
The charger you need depends on how long your vehicles sit, not on the biggest number in the brochure. Here's how to choose AC vs DC, connectors and specs — without overspending.
Last updated 15 August 2026
On this page
“What charger do I need?” is usually the first question operators ask — and the honest answer is: probably not the one a salesperson would sell you. The right hardware follows from how your vehicles are actually used, not from the highest power rating on the page. Choose well and you spend less and draw less power; choose on horsepower alone and you pay twice — once for the charger, and again for the grid capacity to feed it. Here’s how to get it right.
Start with dwell time, not vehicle count
The single most useful number is dwell time — how long each vehicle sits parked and available to charge. A vehicle back at 5pm and out at 6am has a long window and needs only a modest charger to refill overnight. A vehicle on a tight turnaround needs a faster, pricier one. Working from real duty cycles usually reveals you need fewer, gentler chargers than a one-per-vehicle assumption suggests.
AC vs DC: the core choice
AC charging (typically up to 22 kW) uses cheaper hardware and is perfect for vehicles that sit for hours — which is most of a depot overnight. DC charging (50 kW to several hundred kW) is faster but the chargers cost far more and draw big peaks from your grid connection. The usual pattern is mostly AC for the overnight fleet, with a few DC chargers only where the timetable genuinely demands a quick top-up. Buying DC everywhere “to be safe” is the most common way to overspend.
Connectors and compatibility
You don’t really choose the plug — the vehicle does. In the UK and Europe, Type 2 covers AC and CCS covers DC rapid charging, and between them they fit almost every modern electric van, truck and bus. The very largest trucks are moving toward a new high-power standard, MCS, covered in the HGV depot guide. Match the connector and the power to your vehicles; there’s no benefit paying for 150 kW a vehicle can’t accept.
The one spec line that protects you
Whatever you buy, insist it is fully OCPP-compliant. OCPP is the open language that lets chargers work with different management software, so you can switch back-office systems or mix charger brands later instead of being locked to one supplier for a decade. It’s the cheapest insurance in the whole project — and the subject of the standards guide. Ask every supplier the question directly and get the answer in writing.
Tethered, untethered and split systems
A few practical choices remain. Tethered units have a fixed cable (convenient, quicker for drivers); untethered take any cable (flexible, tidier). On larger sites, split systems — a shared power cabinet feeding several dispensers — can be more cost-effective than standalone units and make load sharing easier. These are design details your installer will help with once the AC/DC and quantity decisions are made.
The bottom line
Good hardware choice is mostly about matching charger type and power to how long vehicles actually dwell, favouring AC for the overnight fleet, and refusing to over-buy on speed you can’t use. Nail the OCPP requirement so you stay free to change your mind. Use the Grid Capacity Estimator to see how your charger mix translates into grid demand before you commit to a specification.
Go deeper — articles in this guide
- AC vs DC charging for depots — which, and how much? AC is cheap and ideal for the overnight fleet; DC is fast, pricey and hard on your grid. Most depots need mostly AC with a little DC.
- How to size chargers to your vehicles' dwell time The right charger power comes from how long a vehicle sits, not its battery size. Long dwell means slow and cheap is plenty.
- Connector types explained: Type 2, CCS and MCS You don't choose the plug — the vehicle does. Type 2 for AC, CCS for DC, MCS emerging for the biggest trucks.
- The one spec line that prevents vendor lock-in (OCPP) Insist your chargers are fully OCPP-compliant and you can switch software or mix brands later. It's the cheapest insurance in the project.
- Split charging systems: when a shared power cabinet makes sense On larger sites, a shared power cabinet feeding several dispensers can beat standalone units on cost and make load sharing easier.